NEW HOUSEWIRING CONNECTION APPLICATION | OTHER APPLICATIONS
NEW HOUSEWIRING CONNECTION
Before applying for a new electrical connection, please prepare the following documents and comply with the requirements set by NUVELCO.
Application Requirements
Required Documents:
- Duly Accomplished Application for Membership and Electric Service.
- Tax Identification Number (TIN). If none, fill out BIR Form No. 1904 with attached Special Power of Attorney (SPA).
- Photocopy of one (1) valid ID.
- Barangay Clearance issued by the barangay where the building is located, certifying that no electrical connection is tapped.
- Latest Electric Bill of Nearest Neighbor.
- Electrical Plan signed and sealed by a Professional Electrical Engineer.
- Certificate of Housewiring Installation by an accredited electrical practitioner or barangay electrician.
- Clearance from the concerned NUVELCO Suboffice stating that the applicant has no outstanding obligation and that the building has no previous electrical connection.
- Certificate of Pre-membership Education Seminar (PMES).
Conducted every Monday to Friday at:
_
2:00 PMNUVELCO Head Office, Gabut, Dupax del Sur
Required Fees
| Fee Description | Amount |
|---|---|
| Membership Fee | ₱100.00 |
| ID | ₱100.00 |
| Minimum Share Capital (12 Shares × ₱100.00/share) | ₱1,200.00 |
| Housewiring Fees | Depending on outlets |
| Meter Box and Accessories – Square KWHM | ₱1,050.00 |
| Meter Box and Accessories – Round KWHM | ₱1,219.50 |
| Electrical Plan (1–10 outlets), if prepared by NUVELCO | ₱500.00 |
| Electrical Plan (11 or more outlets), if prepared by NUVELCO | ₱1,000.00 |
Note: Additional charges may depend on the number of outlets and other applicable requirements.
Application Procedure
-
01
Submit Application
Consumer applies for a house connection.
-
02
Complete Requirements
House Wiring Clerk advises the consumer to submit or complete the house wiring requirements.
-
03
Preparation of Charge Billing
House Wiring Clerk prepares the Charge Billing for payment.
-
04
Payment of Application Fees
Consumer pays the application fees, including house wiring, membership fee, and other charges.
-
05
Preparation of Documents
House Wiring Clerk prepares the Turn-On, RV, and other requirements for tapping.
-
06
Consumer Section Head Review
Consumer Section Head reviews the requirements and affixes their signature.
-
07
MSD Chief Verification
MSD Chief verifies the completeness of the requirements, affixes the signature, and forwards the application to the ISD Manager.
-
08
Internal Auditor Review
Internal Auditor reviews and approves the application.
-
09
ISD Manager Approval
ISD Manager approves the requirements and application.
-
10
General Manager Approval
General Manager receives the application for final approval.
-
11
Preparation of Materials
Warehouseman prepares the materials for release.
-
12
Release of Materials
Tapping Crew receives the materials and complete papers.
-
13
Electrical Connection
Tapping Crew taps the applicant as scheduled.
Download Application Form
Get your copy of the Application for Membership and Electric Service. Download and accomplish the form before submitting your application to NUVELCO.
↓ Download Application FormOTHER APPLICATIONS
Explore other application types and their corresponding requirements. Review the details and download the application form below.
Change / Transfer of Ownership
Requirements for any mode of transfer of ownership.
- Fill up the Application Form for Change of Ownership/Name.
- Photocopy of the instrument of transfer/waiver of ownership of land or building, including transfer of share capital.
- Pay a Transfer Fee of ₱200.00 and a Membership Fee of ₱100.00 if not yet a member.
- Clearance from the Area Office indicating that all obligations are paid.
- Fill up the Application Form for Membership and pay the minimum share capital of ₱1,200.00 if not yet a member of the Cooperative.
- Present a valid ID, such as SSS/GSIS, Driver's License, Voter's ID, etc.
- A copy of the Official Electric Bill Receipt (OEBR) of the original owner.
Death of Registered Owner
Requirements for transferring the registered ownership in the event of the owner's death.
- Fill up the Application Form for Change of Name.
- Photocopy of the Death Certificate of the original/registered owner.
- Clearance from the Area Office.
- If the spouse is still living, the OEBR shall be named after him/her.
- If both spouses are deceased, a waiver from the surviving children shall be executed in favor of one of them as transferee, including the transfer of share capital.
- Pay a Membership Fee of ₱100.00 and a Transfer Fee of ₱200.00 for the share capital.
Correction of Name
Requirements for correcting the registered consumer's name.
- Copy of Official Electric Bill Receipt (OEBR).
- Photocopy of a valid ID (Postal ID, Driver's License, SSS/GSIS, etc.).
Change of Status
Requirements for applications involving a change of status.
- Letter request from the owner.
- Clearance from the Area Office.
- Electrical Plan, if needed.
- Payment of fees based on inspection and assessment.
Change of Address / Transfer of Location
Requirements for transferring an existing electrical connection to another address or location.
- Clearance from the Area Office.
- Electrical Plan, if needed.
- Payment of fees based on inspection and assessment.
- Copy of the OEBR of the nearest neighbor at the new address/location.
Download Other Applications Form
Download the NUVELCO form for additional application requests, including change of ownership, correction of name, and other service applications.